Range
Power
Battery Capacity
Battery Warrenty
Charging Time AC
Charging Time DC
Variants | Ex-showroom Price |
---|---|
BYD Sealion 7-, Petrol |
48 Lakh* |
BYD Sealion 7 Premium-, |
51.47 Lakh* |
Variants | Ex-showroom Price |
---|---|
BYD Sealion 7-, Petrol, Automatic, kmpl |
48 Lakh* |
Variants | Ex-showroom Price |
---|
Car Type | Fuel Type | Transmission | Driving Range | Hatchback | Electircal | Automatic | 567 km |
---|
Battery Capacity | 82.56 kWh |
---|---|
Motor Power | 230 kW |
Motor Type | Permanent Magnet Synchronous |
Max Power | 308bhp |
Max Torque | 380Nm |
Driving Range | 567 km |
Battery Type | Blade Battery |
Battery Type | Blade Battery |
Battery Life & Warrenty | 8-year or 160,000 km |
Charging Time (A.C) | 24Min-230kW (10-80%) |
---|---|
Charging Time (D.C) | |
Charging Port | CCS-II |
Charging Option | |
Transmission Type | Automatic |
Gear Box | 1-Speed |
Drive Type | RWD |
Air Bags | 10 |
Fuel Type | Electircal |
---|---|
Top Speed (Kmph) |
Emission Norm Compliance | ZEV |
---|---|
Acceleration 0-100(Kmph) | 6.7 s |
Front Suspension | Double wishbone suspension |
---|---|
Rear Suspension | Multi-link suspension |
Steering Type | Electric |
Steering Column |
Turning Radius (Metres) | 5.85 m |
---|---|
Front Brake Type | Ventilated & Drilled Disc |
Rear Brake Type | Ventilated Disc |
Length (mm) | 4830 |
---|---|
Height (mm) | 1620 |
Width (mm) | 1925 |
Boot Space (Litres) | 500 |
Wheel Base (mm) | 2930 |
---|---|
No of Doors | 5 |
Ground Clearance Unladen | |
Seating Capacity | 5 |
Power Steering | Yes |
---|---|
Power Windows-Front | Yes |
Power Windows-Rear | Yes |
Air Conditioner | Yes |
Heater | Yes |
Adjustable Steering | Yes |
---|---|
Automatic Climate Control | No |
Air Quality Control | Yes |
Remote Trunk Opener | Yes |
Remote Fuel Lid Opener | Yes |
The Byd BYD Sealion 7 Price is 48 Lakh and top model Price is . Byd BYD Sealion 7 last 3 Month Sales is 0
Name of Top model of Byd is BYD Sealion 7 with a Price of Rs. 48 Lakh.
Byd BYD Sealion 7 Sold Units in September Month and 0 Units in Last Quater.